ENVIRONMENTAL IMPACT STATEMENT AND SUPPLEMENTARY ENVIRONMENTAL IMPACT STATEMENT– CENTRAL QUEENSLAND COAL PROJECT
Response to EPBC Proposed Refusal Notice
Response to IESC
October 2020 – The SEIS v3 can be viewed below
Executive Summary
i. Exec Summary
ii. Table of Contents
iii. Glossary
EIS Chapters
-
- Introduction and Project Description_Redacted
- Legislation and Approvals
- Project Changes and Responses to Agency Comments_Redacted
- Climate and Climate Change
- Land
- Traffic and Transport
- Waste Management
- Waste Rock
- Surface Water
- Ground Water
- Rehabilitation
- Air Quality
- Noise and Vibration
- Terrestrial Ecology_Redacted
- Aquatic and Marine Ecology
- MNES_Redacted
- Biosecurity
- Cultural Heritage
- Social and Economic
- Health and Safety
- Hazard and Risk
- Key Commitments
- Draft EA Conditions
- References
EIS Appendices
1 - Project Terms of Reference
2 - Project Alternatives Considered
3a - Land Suitability Assessment
3b - Waste Rock and Rejects
3c - Land Stability Assessment
4a - Road Impact Assessment
4b - Geotechnical Assessment
4c - Road Use Management Plan
5a - Surface Water Quality Technical Report
5b - Flood Study and Water Balance
5c - Draft Mine Water Management Plan
5d - Fluvial Geomorphology
5e - Preliminary Dams Consequence Category Assessment
6a - Numerical Groundwater Model Technical Report Summary
6b - Numerical Groundwater Model and Groundwater Assessment Report
6c - Groundwater Quality Data Summary
6d - Surface Water Groundwater Interactions Report
6e - GW Model Peer Review
6f - Transient Electromagnetic Survey Report
6g - Core Permeability Tests
6h - Cross Sections of Regolith
7 - Air Quality and GHG
8 - Noise and Vibration
9a - 2011-2012 Terrestrial Fauna Reports
9b - Flora and Vegetation Assessment
9c - Threatened Fauna Investigations - Deep Creek
9d - MNES and MSES Supplementary Impact Assessments
9e - Significant Species Management Plan
9f - 2016 and 2020 Database Searches
9g - Composite Fauna Species List (2011 to 2019)
9h - Migratory shorebird count data appendix
10a - Aquatic & Marine Ecology, GDE and GBR Impact Assessment
10b - 2011 Baseline Monitoring Program
10c - Stygofauna Assessment
10d - Groundwater Dependent Ecosystem Assessment
10e - GDEMMP
10f - Draft Receiving Environment Monitoring Program
10g - Waterway Barrier Works Map Amendment Request
10h - Preliminary Isotope Study Results
10i - Estuarine Benthic Study
11a - Bio Diversity Offset Strategy_redacted
11b - Draft Offset Delivery Plan_redacted
11c - Draft Mamelon Offset Area Management Plan_redacted
11d - Draft Offset Area Management Plan for Offset 2_redacted
12 - Draft EMP
13 - EIS and SEIS v1 submissions register
14a - Economic Model Outputs
14b - Stakeholder Engagement Report
14c - Social Impact Assessment
15a - Draft Erosion and Sediment Control Plan
15b - Styx Catchment Sediment Budget
16a - Styx Mine Access Road Civil Drawings (G2001-01)
16b - Styx Mine Dam #1 Civil Drawings (G2001-01)
16c - Styx Mine Haul Road Civil Drawings (G2001-01)
16d - Styx MIA CHPP & Dam 1 Access Rd Civil Drawings (G2001-01)
December 2018 – The SEIS v2 can be viewed below
- Executive Summary
- i. Glossary
- ii. Executive Summary
- EIS Chapters
- Introduction
- Project Needs and Alternatives
- Project Description
- Climate
- Land
- Traffic and Transport
- Waste Management
- Waste Rock
- Surface Water
- Groundwater
- Rehabilitation and Decommissioning
- Air Quality
- Noise and Vibration
- Terrestrial Ecology
- Aquatic Ecology
- Matters of National Environmental Significance
- Biosecurity
- Cultural Heritage
- Social and Economic
- Health and Safety
- Hazard and Risk
- Key Commitments
- Draft EA Conditions
- References
- EIS Appendices
- A1 Approvals
- A2 Standard Criteria
- A3 Soil Survey Results
- A4a Road Impact Assessment
- A4b Geotechnical Assessment
- A4c Draft Road-Use Management Plan
- A5a Water Quality
- A5b Historical Water Quality
- A6 Groundwater
- A7 Air Quality and GHG
- A8 Noise and Vibration
- A9a Terrestrial Fauna Reports
- A9b Terrestrial Flora Assessment
- A9c Ecological Desktop
- A9d Ecological Field Survey Results
- A9e Aquatic Ecology Report
- A9f Stygofauna Survey Results
- A9g Landscape Connectivity Tool Output
- A9h Migratory shorebird count data
- A10 Regional Profiles Residents
- A11 Central Queensland Coal Final Terms of Reference
- A12a Construction EMP
- A12b Operation EMP
- A13 CQC Submissions Register - Updated
- A14 Stakeholder Engagement Plan
- A15 ESCP Typicals_A4
- A16 Construction Design Drawings
- A17 Social Impact Assessment
- A18 Draft Offsets Management Plan
- A19 Vegetation Map Ammendment
- A20 Significant Species Management Plan
- A21 Waterway Barrier Assessment
- A22 Australian Groundwater Modelling Guidelines Review checklist
- A23 Checklist for IESC information guidelines
November 2017 – The EIS can be viewed below:
- Executive Summary
- i. Glossary
- ii. Executive Summary
- EIS Chapters
- Introduction
- Project Needs and Alternatives
- Project Description
- Climate
- Land
- Traffic and Transport
- Waste Management
- Waste Rock
- Surface Water
- Groundwater
- Rehabilitation
- Air Quality
- Noise and Vibration
- Terrestrial Ecology
- Aquatic Ecology
- Matters of National Environmental Significance
- Biosecurity
- Cultural Heritage
- Social and Economic
- Health and Safety
- Hazard and Risk
- Key Commitments
- Draft EA Conditions
- References
- EIS Appendices
- A1 Approvals
- A2 Standard Criteria
- A3 Soil Survey Results
- A4a Road Impact Assessment
- A4b Geotechnical Assessment
- A5a Water Quality
- A5b Historical Water Quality
- A6 Groundwater
- A7 Air Quality Assessment
- A8 Noise Impact Assessment
- A9a Terrestrial Fauna Assessment
- A9b Terrestrial Flora Report
- A9c Ecological Desktop
- A9d Ecological Field Survey Results
- A9e Aquatic Ecology Report
- A9f Stygofauna Survey Results
- A9g Landscape Connectivity Tool Output
- A10a Economic Assessment
- A10b Regional Profiles Residents
- A11 Central Queensland Coal Final Terms of Reference
- A12a Construction EMP
- A12b Operation EMP